From: route@monster.com
Sent: Friday, April 29, 2016 3:31 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
DANIEL EDWIN THOMAS
Home
(423) 365-9136
290 Harbor
Drive
Cell
(865) 805-4320
Spring
City, Tennessee 37381
dthomas269@aol.com EMPLOYMENT
HISTORY: Phoenix of Tennessee / JCCCFS PROJECT MANAGER:
11-15 to
Present Responsible
for providing support and helping to manage the Google Micro-trenching
project in Nashville and Austin for the installation of OSP fiber networks.
This involved the micro-trenching, installation of conduit and setting up
meet point huts. Day and Zimmerman / Watts Bar Nuclear Plant Refueling Outage 13 Construction Craft Supervisor:
9-15 to 10-15
Directly
tied to the Maintenance Services War room working with various internal teams
ensuring that the outage stayed on schedule. Worked with Tennessee Valley
Authority management, the Day and Zimmerman Planning team and craft to ensure
that all requirements were met to have a successful outage. Carolina West Wireless / Contractor
10-14 to
2-15 PROJECT MANAGER: Responsible for maintaining project schedule
while managing relationships between all market functional teams (Finance,
RF, Site Acquisition and Construction) by providing mentoring, training and
technical direction with the key objective to resolve project challenges and
deliver sites for turn-up per contractual commitments. Installations included
tower modifications, new Ericsson equipment, RRU’s and antennas in support of
the CWW 850 LTE and Verizon 700 LRA. Tower Communications
Expert
1-14 to
7-14 Business Development Manager: Develop new relationships and work with existing
customers to assure that TCE is meeting and exceeding all of their needs by
acting as a point of contact for new work and assuring that bids are
generated and submitted. Customers include equipment suppliers, wireless
carriers, tower owners and various turf vendors. Ericsson /
Contractor
8/11 to
6/13 PROJECT MANAGER: Provide day to day support and single point
of contact, Implementation management, for Node B Re-homes and Voice Core
projects tied to AT&T MPC overflow. This requires daily interface with
the customer and the Ericsson internal teams to support planning, review
schedule and to resolve issues which may arise to support successful
completion of activities. I have been involved with over 400 RNC
Re-homes and have worked with over 16 different AT&T markets providing
this support. TVAN /Watts Bar Nuclear Plant/
Day and Zimmerman
4/10 to 5/11 PROJECT ELECTRICAL SUPERINTENDENT: Worked on project team supervising the
installation of a new OSP Fiber optic infrastructure, erection of new camera
towers, replacement of all existing cameras, addition of infrared
cameras, new microwave zones and dishes, addition of low and high mast
lighting and installation of new computers / monitors for the security
upgrade project while keeping the existing system operational. Supervised
upgrades to the security portals and any underground openings in the
controlled areas. Itemized all work scope into the project schedule and
developed cost estimates for installation of the new system. Provided manpower
loading to match schedule, coordinated all training and supervised up to 60
electricians on the project team. AT&T Wireless / Contractor
1/10 to
4/10 MARKET MANAGER: Responsible for all market activities for
UMTS, 3rd Carrier, New Site builds, Fiber to the Site, Generator addition and
Business as Usual for a project value of over 45 million dollars. Managed
Site Acquisition and Project Managers including all functional support teams
providing contracted services to customer. Daily client interface to ensure
project is on schedule, meeting the plan of record in accordance with project
specifications, policies and procedures. Reviewed and improved existing
processes expedite the build plan. Develop accurate project plan
including budget for all assigned projects, directed close out of completed
jobs and receipt of all required documentation. Lead internal
deployment meetings with team members to review the status of each job and
implement changes as necessary to ensure timely project completion. CRICKET / DETCO LLC
11/05 to 12/09 PROJECT MANAGER / CONSULTANT: I have been
associated with multiple New Market launches generating the project schedule,
monitoring milestones, developing program structure, processes and
procedures. Focused on managing relationships between all market
functional teams (Finance, RF, Site Acquisition and Construction) by
providing mentoring, training and technical direction with the key objective
to resolve project challenges and deliver a Quality network ahead of schedule
and under budget. Analyzed bids and awarded work to qualified vendors. Our
process saved Cricket Communications over 2 million dollars in the
Raleigh N.C. market launch keeping the project under projected budget. Being
an avid believer in the communication process; my team developed a clear
scope of work, clarifying project expectations and goals for the functional
teams and to our vendors to support swift market deployment. I organized
project teams, A&E Site visits, developed the Construction Drawing and
standard material templates. DANIEL EDWIN THOMAS TVAN/Browns Ferry Nuclear Plant
2/05 to 11/05 TASK MANAGER: Browns Ferry Nuclear Plant U1 Restart. Direct
Contractor to the Tennessee Valley Authority to provide management oversight
of the prime contractors’ work activities during unit restart. I
assisted in the establishment and clarification of project goals and expectations.
Monitored daily work activities, attended scheduling update meetings and
provided work process enhancement recommendations. Coordinated work
activities across all disciplines as required to meet system completion
milestones. BECHTEL
10/03 to 1/05 SENIOR CONSTRUCTION ENGINEER: AT&T Wireless project. Managed activities
during 1900 GSM BTS addition, 850 GSM overlay/ BTS installs and E-911 PSAP
integration projects. Reviewed site audits, engineering evaluations,
and lease reviews to determine site specific requirements on over 1000 new
cell sites. Provided technical support during the installation of
MCPA’s, installation of Andrews WLS equipment, Kentrox DSU’s, and the
replacement of power plants. Ensured contractors understood project goals,
expectations, and schedule requirements. Monitored
contractor’s compliance to design, project specifications, technical
requirements, and local codes. Verified adherence to Bechtel’s ES&H
Zero Accident Policy and OSHA requirements. STONE
& WEBSTER CONSTRUCTION, INC / TVAN
2/03 to 9/03 SENIOR CONSTRUCTION ENGINEER: WATTS BAR Nuclear Plant. Provided construction oversight by monitoring
subcontractors work activities during the disassembly and reassembly of the
ice condenser. Verified procedural compliance and worked to resolve any
defined schedule or process issues. Sequoyah Nuclear Plant supporting
U1C12 outage and Steam Generator Replacement. Managed work activities,
provided technical direction and maintained schedule during the implementation
of various design changes. SITE PROFESSIONALS / SPRINT
12/99 to 1/03 WIRELESS DEPLOYMENT PROJECT MANAGER: Provided
technical direction on planning, scheduling and engineering functions to
project managers, construction managers and field personnel for the Sprint
PCS 3-G project in 5 markets. Coordinated the program from initial site
candidate walk down and approval thru leasing, drawing development, site
construction, equipment deployment, replacement and optimization. This involved both Nortel and Motorola equipment
at over 500 cell sites. Developed project schedules, budgets, work instructions and
work controls. Also involved with the addition of over 130 new
sites in 3 Sprint markets SBA
/ Knoxville, TN
4/99
to 12/99 WIRELESS PROJECT MANAGER: Responsible for overseeing
tasks in support of raw land site feasibility, drawing development, zoning,
permitting and construction for the Bellsouth Mobility East Tennessee build
out. Ensured sites were constructed on time, within budget and met all
contractual requirements and safety standards. POWER
CONSULTANTS / SPRINT / Atlanta BTA
7/98 to 3/99 IMPLEMENTATION ENGINEER: Directed and coordinated
activities associated with cell site deployment in support of the Sprint PCS
Atlanta market launch. Involved with all aspects of the wireless
telecommunications build out from initial site visit, site construction,
equipment set to site optimization. Obtained bids from
contractors, awarded jobs, and monitored daily events. Generated and
maintained project schedules. BECHTEL /SPRINT/ New
York MTA
2/97 to 11/97 SENIOR CONSTRUCTION ENGINEER: Responsible for managing
and tracking construction milestones associated with the Sprint PCS launch in
the New York market. Interfaced with General Contractors and A/E firms
to resolve construction issues. Established daily work priorities,
organized site closeout and turnover to Lucent / Sprint PCS. RAYTHEON ENGINEERS &
CONSTRUCTION / Watts Bar Nuclear Plant
1993 to 1996 SENIOR FIELD ENGINEER: Monitored and updated
Schedule, prioritizing work required to meet system completion
milestones. Scoped electrical design drawings and planned work
documents. Provided field engineering support during work order
implementation. Reviewed Electrical and Mechanical equipment
installation packages to ensure compliance to design and quality
requirements. Coordinated audits to assure completion of specific
licensing commitments. Developed recurrence controls and root cause
analysis for PER’s and CAQR’s. Prepared closure packages for licensing
commitments. Developed work process and procedure enhancement plans. DANIEL EDWIN THOMAS NACES / Grand Gulf Nuclear
Station
1992 to 1993 MODIFICATION ENGINEER / PLANNER: Responsible for the
preparation of work packages to provide detailed instructions to control and
document design changes and modifications. Prepared Work Permits to
support the replacement of accumulator/receiver tanks associated piping and
the rework of structural steel framing. Provided schedule updates for
logic and work progression. Responsible for in-process inspections to
ensure adherence to design requirements. EBASCO PLANT SERVICES/ Watts
Bar Nuclear Station
1991 to 1992 MODIFICATION FIELD ENGINEER: Worked within TVA’s Electrical
Modification group to review work plans for completeness and to identify
remaining work tied to the installation of conduit, electrical cables and
Raychem splices. Directed feasibility walk down of proposed design
changes. Provided technical assistance, procedure clarification and field
support during installation of electrical cables and equipment. EBASCO SERVICES / Watts Bar
Nuclear Station
1990 to 1991 SENIOR DESIGNER: Reviewed piping systems and
supports per NRC Bulletin 79-14 and 79-02. Designed small and large
bore pipe supports, reviewed proposed design changes, performed
constructability reviews and ordered materials required for support
modifications. Updated piping isometric drawings prior to CAD
upgrade. Reviewed piping packages for accuracy and procedural
compliance. Gilbert Commonwealth/ Perry
Nuclear Plant Level II Mechanical inspector
1985 Duke Power /McGuire Nuclear
Plant Level I Mechanical Inspector
1978
1 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|